Circutor CVM-C10 Series Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Messgeräte Circutor CVM-C10 Series herunter. CIRCUTOR CVM-C10 Series User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - INSTRUCTION MANUAL

INSTRUCTION MANUAL(M001B01-03-15A)Power analyzerCVM-C10

Seite 2

3.3.- UNIT TERMINALS3�3�1�- List of terminals, CVM-C10-ITF, CVM-C10-MC and CVM-C10-mV modelsTable 2:List of terminals of the CVM-C10-ITF, CVM-C10-MC

Seite 3

3�3�2�- List of terminals, CVM-C10-ITF-IN models�Table 3:List of terminals of the CVM-C10-ITF-IN�Unit terminals1 : A1 Auxiliary power supply. 13: I2,

Seite 4 - CONTENTS

3.4.- CONNECTION DIAGRAM3�4�1�- Measuring Three-Phase Networks with a 4-wire connection, CVM-C10-ITF andCVM-C10-mV model�Measurement system:Pow

Seite 5

3�4�2�- Measuring Three-Phase Networks with a 4-wire connection, CVM-C10-ITF-IN model�Measurement system:PowerSupplyVL1 VL2VL3 NL1L2L3NPOWER SUPPLYINP

Seite 6 - REVISION LOG

3�4�3�- Measuring Three-Phase Networks with a 4-wire connection, CVM-C10-MC model�Measurement system:PowerSupplyVL1 VL2VL3 NL1L2L3NPOWER SUPPLYINPUTSA

Seite 7

3�4�4�- Measuring Three-Phase Networks with a 3-wire connection, CVM-C10-ITF and CVM-C10-mV model� Measurement system:Power SupplyVL1 VL2VL3L1L2L3POWE

Seite 8

3�4�5�- Measuring Three-Phase Networks with a 3-wire connection, CVM-C10-MC model� Measurement system:PowerSupplyVL1 VL2VL3 NL1L2L3POWER SUPPLYINPUTSA

Seite 9

3�4�6�- Measuring Three-Phase Networks with a 3-wire connection and transformers with an ARON connection, CVM-C10-ITF, CVM-C10-MC and CVM-C10-mV model

Seite 10 -

3�4�7�- Measuring Two-Phase Networks with a 3-wire connection, CVM-C10-ITF, CVM-C10-MC and CVM-C10-mV models�Measurement system:Power SupplyVL1

Seite 11 - Instruction Manual

3�4�8�- Measuring Two-Phase Networks with a 3-wire connection, CVM-C10-ITF-IN model�Measurement system:PowerSupplyVL1 VL2 NL1L2NPOWER SUPPLYINPUTSA(+)

Seite 12

2CVM-C10Instruction Manual

Seite 13 - Measurement system:

3�4�9�- Measuring Single-Phase Networks, phase to phase, with a 2-wire connection, CVM-C10-ITF, CVM-C10-MC and CVM-C10-mV models�Measurement system:P

Seite 14

3�4�10�- Measuring Single-Phase Networks, phase to neutral, with a 2-wire connection, CVM-C10-ITF, CVM-C10-MC and CVM-C10-mV models�Measurement syste

Seite 15

4�- OPERATIONThe CVM-C10 is a four-quadrant power analyzer (consumption and generation).0º90º180º-90ºCapacitiveCapacitiveInductiveInductiveGeneration

Seite 16 - A(+) B(-)

Table 4 ( Continuation ) : Measuring parameters of the CVM-C10�Parameter UnitsPhases L1-L2-L3TotalIIINHarmonic Breakdown - Current (up to the 31st ord

Seite 17

Table 5 (Continuation ) : Key functions on measuring screens�Key Short keystrokeLong keystroke(2 s)Display of the Maximum Demand Active alarm informat

Seite 18

4.3.- DISPLAYThe unit has a backlit LCD display showing all the parameters listed in Table 3.The display is divided into four areas (Figure 14)

Seite 19

4�3�2� ANALOGUE BARFigure 16: Analogue BarThe analogue bar displays two parameters:  Current power of the installation in % This parameter is displ

Seite 20

4.4.- LED INDICATORSThe CVM-C10 unit has 3 LEDs: - CPU, indicates that the unit is on, ashing each second. - ALARM, indicates that an alarm

Seite 21

The unit displays 11 different screens for the analyzer prole (Table 9)Use keys and to browse the different screens.The inst symbol on the bottom

Seite 22 - Consumption

Table 9 ( Continuation ) : Analyzer profile screens�Screen Parameters (units)Apparent Power L1 (M/KVA)Apparent Power L2 (M/KVA)Apparent Power L3 (M/

Seite 23

SAFETY PRECAUTIONS DISCLAIMERCIRCUTOR, SA reserves the right to make modi cations to the device or the unit speci ca-tions set out in this instruct

Seite 24

Table 9 ( Continuation ) : Analyzer profile screens�Screen Parameters (units)Power factor L1 (PF)Power factor L2 (PF)Power factor L3 (PF)Power facto

Seite 25 - Figure 15: Cos φ - PF Bar

Figure 20: Analyzer prole screen displaying the minimum values.  Maximum Demand The unit calculates the maximum demand of the following: • Cur

Seite 26 - Figure 16: Analogue Bar

The installation's consumed and generated energy are displayed on the e3 prole of the unit.The installation status is also displayed: Inst

Seite 27 - Figure 18)

Table 10 ( Continuation ) : Screens of the e3 profile�Screen Parameters (units)Capacitive Reactive Energy Tariff 1, T1 (M/KvarCh)Capacitive Reactive

Seite 28

4�5�3� USERThis prole is identied with the user symbol on the bottom of the screen (Figure 23).Figure 23: Screen of the CVM-C10 with the user prole

Seite 29

4.7.- INPUTS The CVM-C10 has two digital inputs (terminals 12 and 13 on Figure 1) that can be programmed to operate as a logic or tariff select

Seite 30

4.9.- PROGRAMMINGFrom the programming menu you can:  Lock the status of the menu.  Dene the transformation ratios.  Select the number of

Seite 31 - Figure 22)

If you press the key after changing the last digit, it will jump back to the rst digit so you can modify the previously programmed values again.To

Seite 32 - prole

4�9�2� Secondary voltage On this screen the voltage transformer secondary is programmed.Press key for 3 seconds to edit the transformer secondary

Seite 33 - profile�

Maximum programming value: 10000.Minimum programming value: 1.Voltage ratio x Current ratio < 600000NB: The ratio is the relation between the prima

Seite 34

CONTENTSSAFETY PRECAUTIONS ��������������������������������������������������������������������������������������������������������������������������

Seite 35

4�9�6�Secundary neutral current (model CVM-C10-ITF-IN) The neutral current transformer secundary is programmed on this screen.Press key for 3 sec

Seite 36

Single-phase network measurement, phase to neutral, with a 2-wire connection.To validate the data, press for 3 seconds and the prog icon will dis

Seite 37 - “4.9.29. Locking the

4.9.11. Selecting the operation prole The unit's operation prole is selected on this screen.Press key for 3 seconds to edit the op

Seite 38

 Selecting the screensThe following screen will be displayed if you have selected : This screen displays the first screen of the analyzer prof

Seite 39

4�9�13� Selecting the Cos φ - PF bar on the display This screen is used to select the Cos φ - PF bar viewing option.Press key for 3 seconds to e

Seite 40

4�9�16� Selecting the Range of energies The operation of the range of energy is selected on this screen.Press key for 3 seconds to edit the selec

Seite 41

4�9�18� kgC02 carbon emission ratio of generated energy The carbon emissions ratio is the amount of emissions released into the atmosphere to prod

Seite 42

When the desired value is shown on the screen, move onto the next digit by pressing the key to modify the other values.If you press the key after

Seite 43

4�9�21� Cost Ratio of consumed energy The cost per kWh of electricity of the three tariffs of the unit is calculated on this screen.Press key for

Seite 44

If you press the key after changing the last digit, it will jump back to the rst digit so you can modify the previously programmed values again.To

Seite 45

4�9�15� Deleting energy values �����������������������������������������������������������������������������������������������������������������444�9�

Seite 46

 Programming the maximum value The maximum value: the alarm is activated when this value is exceeded.Press key for 3 seconds to edit the maximum va

Seite 47

In the case of some parameters (Table 14) you can modify the position of the decimal point. To do so, press key after modifying the last digit and t

Seite 48

 Programming the latch The interlocking is selected on this screen, i.e., if the alarm is interlocked after it has been tripped, even when the co

Seite 49

 Programming the contact status The status of relay contacts is selected on this screen.Press key for 3 seconds to edit the selection. The prog ic

Seite 50

If you press the key after changing the last digit, it will jump back to the rst digit so you can modify the previously programmed values again.To

Seite 51

Maximum programming value: 999.999 KWhMinimum programming value: 000.001 KWh Example: To program 500 Wh per pulse: 000.500 To program 1.5 kWh

Seite 52

4�9�26� Operating mode of digital input 1 The function of digital input 1 is selected on this screen.Press key for 3 seconds to edit the function s

Seite 53

4�9�28�1 Modbus protocol Transmission speed The transmission speed of modbus communications is programmed on this screen.Press key for 3

Seite 54

even parity. odd parity.To validate the data, press for 3 seconds and the prog icon will disappear from the display.P

Seite 55

To validate the data, press for 3 seconds and the prog icon will disappear from the display.Press key to access the next programming step. Device

Seite 56

REVISION LOGTable 1: Revision log�Date Revision Description04/14 M001B01-03-14A Initial Version06/14 M001B01-03-14BChanges in the following sections:

Seite 57

Press key to access the next programming step.4�9�29� Locking the programming This screen is for protecting the data configured in the

Seite 58

4.10.- COMMUNICATIONSThe CVM-C10 units have one RS-485 communications port.The unit has as standard two communications protocols: MODBUS RTU ®

Seite 59

4�10�2� PROTOCOLIn the Modbus protocol, the CVM-C10 unit uses the RTU (Remote Terminal Unit) mode. The Modbus functions implemented in the unit are a

Seite 60 - “4.10.3.6.16. Password

Response:Address Function Initial log Value CRC0A 05 0834 FF00 CEEF4�10�3� COMANDOS MODBUS4�10�3�1� Measurement variables�All the adresses of Modbus

Seite 61 - “4.9.28. RS-485

Table 16 ( Continuation ) : Modbus memory map (Table 1)Parameter Symbol Instantaneous Maximum Minimum UnitsNeutral Current N A N 44-45 14A-14B 1A8-1A

Seite 62

Table 17 ( Continuation ) : Modbus memory map (Table 2)Parameter Symbol Tariff 1 Tariff 2 Tariff 3 Total UnitsGeneration Cost $ 84-85 AE-AF D8-D9 102

Seite 63

Table 19:Modbus memory map (Table 4)�Parameter L1 Current L2 Current L3 Current UnitsFundamental Harm. A88-A89 AA8-AA9 AC8-AC9 mA x 102nd Order harmon

Seite 64 - 4�10�3�2� Energy variables

4�10�3�5� Power status�TAll the Modbus map addresses are hexadecimal.The 0x04 function is implemented for this variable.This variable indicates the q

Seite 65

4�10�3�6�2� Neutral current transformation ratios (CVM-C10-ITF-IN)�Table 24:Modbus memory map: Neutral current transformation ratios�Transformation r

Seite 66

4�10�3�6�7� Display backlightTable 29:Modbus memory map: BacklightBacklightConfiguration variable Address Valid data marginDefault valueBacklight 2B5

Seite 67 - Table 22:

1�- VERIFICATION UPON RECEPTIONCheck the following points when you receive the unit: a) The unit meets the specications described in your order.

Seite 68

4�10�3�6�11� Programming alarms 1 and 2 (Relays 1 and 2)Table 33:Modbus memory map: Programming alarms 1 and 2�Programming alarms 1 and 2Configuratio

Seite 69

Table 37:Variable format: Status of digital inputs�Bit 7 Bit 6 Bit 5 Bit 4 Bit 3 Bit 2 Bit 1 Bit 00 0 0 0 0 0Input 20: OFF1: ONInput 10: OFF1: ON4�10�

Seite 70 - Table 37:

4.10.3.6.16. Password congurationThese variables allow you to lock or unlock access to the programming menu, and also allow you to change the passwo

Seite 71 - Table 39:

4�10�5� MAPA PICSPICSVendor Name: CIRCUTORProduct Name: CVM-C10Product Model Number: 0116Application Software Version: 1.0 Firmware

Seite 72

DESCRIPTION SYMBOL ID OBJECTS OBJECT NAME UNITSPotencia activa Active power kW 2 AI7 ActPwrPh2 kWPotencia reactiva Reactive power kvar 2 AI8 ReactPwrP

Seite 73 - 4�10�5� MAPA PICS

DESCRIPTION SYMBOL ID OBJECTS OBJECT NAME UNITSPotencia aparente L3 Aparent power L3 kVA AI42 AppPwrPh3 kVAPotencia aparente trifásicaThree phase apar

Seite 74

5�- TECHNICAL FEATURESAC Power supplyRated voltage85 ... 265 V ~Frequency 50 ... 60 HzConsumption 4 ... 6 VAInstallation category CAT III 300 VDC Po

Seite 75

( Continuation ) Pulse outputs (CVM-C10-ITF CVM-C10-MC and CVM-C10-mV)Maximum frequency 16 impulses / secPulse width 30 ms to 500 ms (Programmable)Re

Seite 76 - 5�- TECHNICAL FEATURES

( Continuation ) StandardsVDE 0110Test for ammability of plastic materials for parts in devices and appliancesUL 94Electromagnetic compatibility (EM

Seite 77

6�- MAINTENANCE AND TECHNICAL SERVICE 7�- GUARANTEE• No returns will be accepted and no unit will be repaired or replaced if it is not ac-companied b

Seite 78

3�- UNIT INSTALLATION 3.1.- PRIOR RECOMMENDATIONSIn order to use the unit safely, it is critical that individuals who handle it follow the safe

Seite 79

8�- CE CERTIFICATE80CVM-C10Instruction Manual

Seite 80 - 8�- CE CERTIFICATE

81Instruction ManualCVM-C10

Seite 81

CIRCUTOR, SA Vial Sant Jordi, s/n08232 -Viladecavalls (Barcelona)Tel.: (+34) 93 745 29 00 - Fax: (+34) 93 745 29 14 www.circutor.es central@circuto

Seite 82 - Vial Sant Jordi, s/n

3.2.- INSTALLATIONThe unit will be installed on a panel (92+0.8 x 92+0.8 mm panel drill hole, in compliance with DIN 43700). All connections ar

Kommentare zu diesen Handbüchern

Keine Kommentare